The requirements for Certification by Professional Engineer finalized in 605411ad for closed vent systems and 605393a for pneumatic pump technical infeasibility determination at brownfield. All hardcopy reports to Compliance and Enforcement must be submitted using a Report Submittal Form.
Https Encrypted Tbn0 Gstatic Com Images Q Tbn And9gcs0stev4stxfrt8nnwv 4qg0knhb2rhltgiotqocxd2zsrbpfiw Usqp Cau
322015 electronic reporting requirements.
Nsps ooooa reporting form. Environmental Protection Agencys New Source Performance Standard NSPS Subpart OOOO. Part 60 Subpart OOOOa Oil and Natural Gas Sector. DEQ Form 110-502 LBP Quarterly Report Form InspectorRisk Assessor DEQ Form 110-503 LBP Quarterly Report Form Supervisor Project Designer DEQ Form 100-733 SLEIS User Registration Adobe PDF DEQ Form 100-882 Designation of Responsible Official SLEIS Registration Adobe PDF Administrative.
1092020 The New Source Performance Standard NSPS OOOO and OOOOa underwent amendments that were finalized on August 13 2020. Therefore this date becomes the effective date for NSPS OOOOa Based on. These reports required in the new source performance standards NSPS in part 60 of chapter 40 of the Code of Federal Regulations are already being submitted in hard copy.
Facilities should submit their 605422aa and 605422ab Semiannual and initial Semiannual report with CEDRI using the spreadsheet templates linked below. In Section II please only select one box A-G. 7232020 The notification is required by the US.
API Administrative Reconsideration Request for Subpart OOOOa August 2 2016 1 I. Air operating permit in the list of schedules to submit the compliance report or testing report tied to the active permit to operate. Fugitive Emissions Requirements 2.
A compressor eg a storage tank vs. Because this provision does not specifically address modifications of a well. 1272020 Submit a 40 CFR 6054202i Notification of Well Completion for NSPS OOOOa No Pro tip.
OOOOa Reporting March 16 2020 - Note. ONE FORM PER SUBMITTAL. The form is now a shorter interactive PDF that you can submit to the TCEQ via e-mail.
If the reporting form specific to this subpart is not available in CEDRI at the time that the report is due you must submit the report to the Administrator at the appropriate address listed in 604. Certification of Closed Vent Systems Requirements Initial Compliance Date LDAR Compliance Date EPA published proposed 90 days stay EPA published proposed 2-year stay NSPS OOOOa Effective Date 2016. Proposed Rule at 83 Fed.
Once the form has been available in CEDRI for at least 90 calendar days you must begin submitting all subsequent reports via CEDRI. Timeline of NSPS OOOOa Delays 2017 NSPS OOOOa Delays proposed for. Oil and Natural Gas Sector and the TCEQ is the delegated authority for this rule.
Do NOT submit any reports via faxDo NOT submit NSPS OOOO or OOOOa well. ISSUES FOR WHICH WE REQUEST ADMINISTRATIVE RECONSIDERATION 1. These submittals are not evaluated by the AQB Compliance and Enforcement Section.
12172018 EPAs reconsideration of the New Source Performance Standards NSPS 40 CFR. If you have two submittals use two submittal forms and separate the. Reporting for Storage Vessel Affected Facilities Initial annual report due January 15 2014 Subsequent reports due 90 days following end of reporting period General information Storage vessel information Identification and location of each storage vessel affected facility constructed modified or reconstructed during the period.
9152020 The 2016 NSPS subpart OOOOa specifies that for the purposes of fugitive emissions components at a well site a modification occurs when 1 a new well is drilled at an existing well site 2 a well is hydraulically fractured at an existing well site or 3 a well is hydraulically refractured at an existing well site. If you have an active Operating Permit filter the available forms by AOP. 52056 October 15 2018.
Well Site Pneumatic Pump Requirements 3. This rule would require certain types of industrial sources to electronically submit to the EPA specific air emissions data reports. Please do NOT use the Reporting Submittal Form for submittals such as Emission Inventories Modeling Analyses and Permit Applications.
382016 New Source Performance Standards NSPS Subpart OOOOa Standards of Performance for Crude Oil and Natural Gas Facilities for which Construction Modification or Reconstruction Commenced After September 18 2015 Proposed rule published September 18 2015. 8232011 applicability under NSPS OOOOa ConstructionAffected Facility Definitions Construction - fabrication erection or installation of an affected facility Affected facility - with reference to a stationary source any apparatus to which a standard is applicable eg an engine vs. Electronic reporting using Compliance and Emissions Data Reporting Interface CEDRI.
The policy amendment is final and effective September 14 2020 while the technical amendment will become effective on November 13 2020 which is 60 days after publication. Emission Standards for New Reconstructed and Modified Sources.